Buyer:
The documentation is paywalled, but the lot items are public. The analysis is built on these.
| # | Lot items | Quantity | Unit |
|---|---|---|---|
| 1 | Zəngilan rayonu, Zəngilan kənd yaşayış məntəqəsində fərdi yaşayış evləri, çoxmənzilli binalar və mühəndis kommunikasiya sistemlərinin tikinti-quraşdırma işlərinin satın alınması _ | 1 | ədəd |
Thin history: only 3 comparable procurements. The conclusion is weak.
3 procurements, 3 different winners
Wins most often: "PROTEAN CONSTRUCTION" AÇIQ SƏHMDAR CƏMİYYƏTİ (1, 33.3%)
Based on: this buyer, this category
Winners went 0.08% to 70.01% below the estimate, median 12.49%.
For this tender that is AZN 87,933,013 down to AZN 79,567,966.
Nobody has ever won below AZN 27,268,236.
AZN 10,025
Documents AZN 25 + participation AZN 10,000
The bid bond and your own time come on top of this.
What the buyer published about this procurement after announcing it. The label is our reading; the text under it is the buyer's, unedited.
· AZN 72,676,870
05 may 2026-cı il tarixində Zəngilan rayonu, Zəngilan kənd yaşayış məntəqəsində fərdi yaşayış evləri, çoxmənzilli binalar və mühəndis kommunikasiya sistemlərinin tikinti-quraşdırma işlərinin satın alınması üçün keçirilən açıq tenderdə "19 SAYLI TİKİNTİ TƏMİR İDARƏSİ" MƏHDUD MƏSULİYYƏTLİ CƏMİYYƏTİ (4700367351) qalib elan olunmuş və həmin şirkətlə 72.676.870,15 AZN (yetmiş iki milyon altı yüz yetmiş altı min səkkiz yüz yetmiş manat, 15 qəpik) məbləğində müvafiq satınalma müqaviləsinin bağlanması nəzərdə tutulub. Gözləmə müddəti (təklifin akseptindən əvvəl təchizatçılara satınalmanın nəticələri ilə bağlı müraciət etmək, o cümlədən nəticələrdən şikayət etmək hüququnu verən müddət) 5 (beş) iş günü ərzində qüvvədə olacaqdır.
From 32 published results of its procurements.
last won 10 Sept 2026
last won 03 Jul 2026
last won 21 Oct 2025
last won 25 Sept 2025
last won 27 Jan 2025